Martin Saves Cement Plant $5,000 Per Month In Labor And Equipment
Produtos usados Cavalete Trac-Mount™ , VPlow HD
Tipos de produtos usados Pontos de Transferência , Vedação da Correia , Suporte da Correia , Proteção Traseira
[unset] Instalação
Indústria Cimento
cliente Cement Plant in Texas, USA

Problem

Wear Liner creates a dam to shield the sealing system from the weight of the material load, prolonging the life of the seal.

Handling around 336,000 tons of limestone, the plant was experiencing major problems with dust and material spillage on their crusher discharge belt coming from the quarry. This required clean up with a bobcat at a minimum of once every week. It was also causing belt support idlers to become engulfed in material, causing premature failure and belt wear due to idlers freezing up. The plant estimated this problem was costing $5,000 per month in labor and equipment costs.

Solution

The addition of the External Wear Liner provided effective sealing.

Martin removed the old system and discovered the chute walls were not straight and that pieces of metal and wear liner had been scabbed in over the years, creating a "wave" when you looked down the conveyor. After cutting out all of the scabbed metal work and welding in new pieces of chute wall, Martin installed internal chute wall supports. Once it was straightened out, Martin added metal to the chute walls to fill the gap between the chute wall and belt face. EVO® External Wear Liners was then installed to prevent material from spilling out of the conveyor. Martin also recommended a Martin® VPlow HD to protect the tail pulley. Three sets of Martin® Trac-Mount™ Idlers were also added to better support the belt through the load zone.

Results

Martin® Trac-Mount™ Idlers utilize sliding frames that will fit in tight spaces allowing for easy installation and service.

Positive results were immediately noticed. Dust was not blowing out of the apron seal and no spillage was observed. Martin has made several visits to the plant over the past few months and all of the plant feedback has been great. It is still performing just as it was when installed. The plant has commented that they would like to make the same upgrades to several other conveyors throughout the plant.

Biblioteca

PDF - Printable Version of Case Study Download
Brochure - Transfer Point Solutions Download
Brochure - MartinPLUS® Services Download
Brochure - Martin Engineering Corporate Profile Download

Visualizar recursos adicionais

Resolvemos o seu problema!

Com mais de 70 anos de experiência resolvendo problemas em todo mundo com os profisisonais mais experientes e educados em nossas equipes, podemos assegurar-lhe que ficaremos perto o suficiente para saber o que precisa ser feito em seguida e resolver o seu problema.

Deixe-nos lhe mostrar a solução.