Problem

Located on Alaska's scenic Resurrection Bay, the shiploader at the Port of Seward loads coal for export.

To allow expansion of its cross-Pacific coal exports, Aurora Energy Services (AES) needed to increase the flow of coal through the shiploader at its Port of Seward terminal. But transfer chutes on the shiploader choked at rates above 750 mtph, which limited loading speed and slowed ship-turnaround. Even worse, the escape of coal dust during loading led to concerns from a nearby cruise ship dock and marinas, as well as environmental groups.

Solution

To improve flow and reduce the escape of dust and spillage, Aurora Energy Services authorized improvements to the shiploader's boom conveyor.

AES officials looked for ways to upgrade the terminal's material handling system and selected the EVO® Conveyor Architecture from Martin Engineering. Included in the improvements was a transfer chute, custom engineered for increased material flow without bottlenecks.

This hood-and-spoon chute provides consistent flow to reduce material spread and impact. Components of the EVO® System improve the serviceability, because they are accessible from outside the structure. The EVO® External Wear Liner and Martin® ApronSeal™ Double Skirting combine to prevent dust and spillage. "When AES management realized they could increase through-put, improve safety and reduce environmental impact all at once with the EVO® technology, they were all for it," said Terminal General Foreman Vic Stoltz.

Results

With its slide-in/slide-out cradles and external wear liner, the EVO® Conveyor Architecture simplifies maintenance.

With the EVO® System in place, the Port of Seward has raised its loading rate by more than 15 percent, to 850 mtph. Shiploading time has been cut by an average of 21 hours, resulting in a significant reduction in demurrage charges. With the improved control of the material stream, there is also less dust. Stoltz reports cleanup is minimal and the process is complete in less than four hours. "We've reduced the cleanup time on the shiploader and dock by over 40 With its slide-in/slide-out cradles and man-hours per ship," he added.

Biblioteca

PDF - Printable Version of Case Study Download
Brochure - Port Industry Download
Brochure - Transfer Point Solutions Download
Brochure - Martin Engineering Corporate Profile Download

Visualizar recursos adicionais

Resolvemos o seu problema!

Com mais de 70 anos de experiência resolvendo problemas em todo mundo com os profisisonais mais experientes e educados em nossas equipes, podemos assegurar-lhe que ficaremos perto o suficiente para saber o que precisa ser feito em seguida e resolver o seu problema.

Deixe-nos lhe mostrar a solução.