Clientes no Peru testam raspadores Martin® - Peru - Raspadores - (conteúdo na íntegra em inglês)
Produtos usados DT2 Inline Cleaner , DT2 Inline Cleaner XHD , Raspador QC1™ HD
Tipos de produtos usados Raspadores de Correia , Raspadores Primários , Raspadores Secundários
[unset] Instalação
Indústria Mineração
cliente La Quinua Agglomeration Plant, Newmont Mining Corp. Minera Yanacocha, Peru

Problema

The parallel conveyors at the La Quinua Agglomeration Plant provided the opportunity for comparative testing of belt cleaner performance.

Plant management wished to compare the performance of competitive belt cleaning systems. 

Solução

The plant operates parallel (redundant) conveyor systems that carry approximately the same material load on the same operating schedule. Installing competing belt cleaners on the side-by-side conveyors allowed the plant to compare belt cleaning results. A Martin Engineering belt cleaning system was installed on Belts #1 and #2 North. On Belt #1 North, this system consisted of a Martin® QC1™ Cleaner HD, a Martin® SAF2™ Cleaner, awater spray bar, a Martin® DT2 Cleaner and a Martin® DT2 Inline Cleaner XHD.

All three of the secondary cleaners incorporated tungsten carbide blade tips. Comparable belt cleaning systems supplied by a competitor were installed on Belts #1 and #2 South. Tests were conducted to analyze the amount of carryback remaining on the belts after the belt cleaners were installed. In these tests, a putty knife is held against the moving belt for ten seconds to remove residual material. The material removed is then weighed, and this amount is multiplied up to provide the amount of material left remaining on the belt during a day of operation.

Resultados

The Martin Engineering Belt Cleaning System installed on Belts #1 and #2 North (above top) removed more residual material than the competitive cleaners installed on Belts #1 and #2 South (above bottom).

It was calculated that the belt cleaners from Martin Engineering left approximately 28.5 metric tons of material on Belt #1 North over 24hours of operation. The testing showed the competing belt cleaning system on Belt #1 South left 171 metric tons of material in 24 hoursof operation. On the surge pile conveyors—Belt #2 South—the competing cleaner, left 23.8 metric tons of material as estimated over a 24-hour period.

The Martin® Belt Cleaners left only 5.15 tons of material over the same period on Belt #2 North. The test report noted that neither cleaner could remove 100% of the materials due to excessive wear and damage in some areas of the conveyor belt. Based on the test results, Martin Engineering’s representative in Peru recommended the adaptation of the same Martin® Multiple Cleaners on all conveyors in the plant.

Biblioteca

PDF - Printable Version of Case Study Download
Brochure - Mining Industry Download
Brochure - Belt Cleaners Download
Brochure - Martin Engineering Corporate Profile Download

Visualizar recursos adicionais

Resolvemos o seu problema!

Com mais de 70 anos de experiência resolvendo problemas em todo mundo com os profisisonais mais experientes e educados em nossas equipes, podemos assegurar-lhe que ficaremos perto o suficiente para saber o que precisa ser feito em seguida e resolver o seu problema.

Deixe-nos lhe mostrar a solução.